Byrne & King have been working on projects in the general construction industry for over 17 years, on a huge variety of domestic and commercial projects.
Working on projects from bulk excavation and trenchwork to reinforced concrete, flooring, paving and drainage, we are proud to have always delivered the highest quality standards. Below you can see some examples of some of our recent work.
Live Projects
Contract |
Company |
Value |
ProCathedral, Bristol (Labour / Plant & Materials) Groundworks Package for the construction of new student accommodation in the existing Pro Cathedral in Bristol. Works involve: Pile Attendance; installation of Pile mats; construction of RC pile caps and beams inside the Cathedral and externally; ground floor slabs; drainage; ductwork, earthworks and external landscaping. |
Vinci Construction |
£880,000 |
Western Apron Extension, Bristol Airport (Labour & Plant) Works include the construction of all RC Duct Pits; RC MH Cover Slabs; Installation of Gatic Slot Drains in the new apron as well as adjacent to the existing taxiway (Includes Night Shifts), Foundations to the new Snow Shed as well as the internal and external concrete slabs; Installation of new HML Bases and Kerbs. |
VolkerFitzpatrick |
£163,700 |
Mogden Sewerage Treatment Works, Twickenham (Labour & Plant) Upgrading and extension of the existing Mogden STW for Thames Water. Works include; construction of new roads (Including earthworks and Kerbs); installation of drainage and ductwork and the installation of the Wash Water and Potable Water pressure pipes. |
Black & Veatch |
£299,400 |
Tedworth House – [H4H – Help For Heroes] Construction works to turn an existing manor house into accommodation for injured Soldiers. Works involve: Earthworks; drainage; asphalt; road markings; tree clearance; soft strip; construction of a new 3 storey RC Building including a 4m deep basement. Installation of the temporary works and frames for the basement. |
Vinci Construction |
Currently at £2,500,000 |
ERF Newhaven (Labour / Plant & Materials) Complete groundworks package for new Energy Recycling facility on the bank of the River Ouse. Works include all drainage / ducts / roads / earthworks / concrete service yards and deep pumping stations including a storm outfall into the River Ouse. |
Hochtief |
£2,350,000 |
Recently Completed Contracts:
Contract |
Company |
Value |
Crossrail Tunnelling Academy, Ilford (Labour & Plant) Groundworks contract for the construction of the foundations, earthworks, drainage and ducts, kerbs and roadways. |
VolkerFitzpatrick |
£300,00 |
Accolade Wines, Avonmouth (Labour / Plant & Materials) Carry out attendance to pile testing as well as various repairs to the concrete service yard and internal warehouse floor. |
VolkerFitzpatrick |
£100,00 |
STRYKER HQ, Newbury Foundations, Drainage, Services as well as car park and road construction for new Warehouse / Office |
VolkerFitzpatrick Ltd |
£271,700 |
Heathrow South Cargo Centre Construction of foundations to new warehouse plus associated drainage, road construction, a pumping station and service installations. |
VolkerFitzpatrick Ltd |
£348,500 |
BHS Swindon (Labour / Plant & Materials) RC foundations and floor slab to new BHS unit and five adjacent units. Works include internal and external drainage and associated external works. |
John Sisk & Sons |
£700,000 |
Southend Airport (Labour / Plant & Materials) Construction of foundations to new Air Traffic Control Tower as well as the internal concrete floors. Works also include construction of two number car parks for the rail station as well as associated roads |
Readie Construction Ltd |
£580,000 |
Oakfield School, Dartford Completed the external works to the new school (on the existing school’s grounds). Works included earthworks, drainage, ducts & all associated kerbs. |
VolkerFitzpatrick Ltd |
£120,000 |
Groundworks Package – ARU Cambridge (Labour / Plant & Materials) Construction of RC foundations and floor slabs to new building in confirmed area within existing campus. Included all drainage (Internal & external) as well as service installations. |
VolkerFitzpatrick Ltd |
£900,000 |
Enabling Works – ARU, Cambridge (Labour / Plant & Materials) Site preparation in advance of main works package. |
VolkerFitzpatrick Ltd |
£110,000 |
Crawley Crossing – Milton Keynes (Labour / Plant & Materials) Part demolition of existing retention tank, pre-cast retaining wall and new road construction. |
Readie Construction Ltd |
£87,000 |
Enviro 21 Business Park – Hastings Groundworks for 4 no. business units/offices on a site adjacent to a SSSI with particular constraints relating to wildlife and environmental controls. |
VolkerFitzpatrick Ltd |
£800,000 |
Morrison Distribution Centre – Sittingbourne Installation of foundations, drainage, approx. 6000 no. flared head piles for a new 920,000 sq ft warehouse and distribution centre. |
VolkerFitzpatrick Ltd |
£1,198,000 |
Quadrant Park – Portishead Foundations, earthworks, drainage and associated external works for a retail park development. |
Marbank Construction Ltd |
£130,000 |
Constellation Europe – Avonmouth RC foundations, drainage, interceptors, pumping stations and all external works associated with a new 900,000 sq ft storage and distribution centre. |
VolkerFitzpatrick Ltd |
£2,840,000 |
BBC Broadcasting House – London Installation of ACO Deckline drainage channel withing an existing basement plant room for the BBC. |
ECEX |
£20,000 |
Bus Depot – Cricklewood, London Foundations, drainage and external works. |
VolkerFitzpatrick Ltd |
£203,000 |
Cullina Logistics – Haverhill 200,000 sq ft logistics centre comprising of foundations, drainage, external works and hard landscaping. |
VolkerFitzpatrick Ltd |
£490,000 |
Panasonic – Northampton Groundworks for a new warehouse facility adjacent to Panasonic’s existing distribution centre in Northampton. |
John Sisk and Sons Ltd |
£363,000 |
Alfred Road – Paddington, London Foundations, drainage and external works for a new arts centre in Paddington. |
Readie Construction Ltd |
£135,000 |
Head Office – Birmingham Foundations, drainage, outfall, paving etc. for Goodmans new head office at Birmingham Business Park. |
VolkerFitzpatrick Ltd |
£202,000 |
Deseronto Trading Estate – Slough Groundworks associated with a new 2,000 sq. ft unit. |
Readie Construction Ltd |
£103,000 |
ICI Paints – Slough Removal and re-instatement of existing concrete access roads. Close co-ordination with ICI to maintain their operations while works were being carried out. |
VolkerFitzpatrick Ltd |
£208,000 |